historyWikipedia1885–1894 · London, England
Tower Bridge took eight years to build and was designed to look like the Tower of London
By the late 1800s London's East End needed a new river crossing downstream of London Bridge, but a fixed bridge would block sailing ships reaching the Pool of London. After more than fifty designs were submitted, Parliament approved a bascule bridge in 1885, with a central span split into two leaves that rise to let ships pass. Construction started in 1886 and took eight years, with 1,200 workers involved overall and ten fatal accidents. It opened on 30 June 1894 and cost £1,184,000.
A bascule bridge has leaves that pivot upward, so the roadway opens for tall ships and then lowers again. Its steel framework is clad in stone to protect the metal and to match the look of the nearby fortress.
Tower Bridge shows how a bridge had to satisfy both road traffic and maritime trade, a tension that shaped its design. Its Victorian Gothic towers were chosen to harmonise with the nearby Tower of London, so it became one of the most recognised landmarks in London.
Cities often had to balance road crossings against river traffic, which led to movable bridges across many ports. Tower Bridge is one of the best-known examples of that compromise.
Tower Bridge's walkways between its towers became a haunt of prostitutes and pickpockets and were closed in 1910.
see
key facts
- Country
- United Kingdom
- Located in
- London Borough of Tower Hamlets
- Founded
- 1886
- Height
- 65 m
- Made of
- steel
Facts: Wikidata (CC0)
From Wikipedia, the free encyclopedia · text CC BY-SA 4.0
Image: Wikimedia Commons

